Business Processes / 3.2.2
No WAN Installation – ESME Credit with HCALCS
19 primary steps · 2 associated steps
| Step | SRV | Description | Comment |
|---|---|---|---|
| 1 | 8.11 | Update HAN Device Log | Change in InstallCode field attribute – DUIS 3.0 |
| 2 | 8.11 | Update HAN Device Log | onwards. |
| 3 | 8.13 | Return Local Command Response | Update SR 8.11 response to DCC |
| 4 | 8.13 | Return Local Command Response | Device Alert 0X8F12 |
| 4.1 | — | Wait For DCC Alert N24/N25 | If N24 received then go to next step. |
| 5 | 6.21 | Request Handover Of DCC Controlled | Supplier Certificate |
| 6 | 6.21 | Device | — |
| 7 | 1.1.1 | Update Import Tariff (Primary Element) | — |
| 8 | 6.8 | Update Device Configuration (Billing | — |
| 9 | 6.8 | Calendar) | — |
| 10 | 8.13 | Return Local Command Response | Update SR 6.8 response to DCC |
| 11 | 1.5 | Update Meter Balance | ‘Adjust’ |
| 12 | 6.14.1 | Update Device Configuration (Auxiliary Load | New N58 alert to DNO |
| 13 | 6.14.1 | Control Description) | New N58 alert to DNO |
| 14 | 8.13 | Return Local Command Response | Update SR 6.14.1 response to DCC |
| 15 | 6.14.2 | Update Device Configuration (Auxiliary Load | New N58 alert to DNO |
| 16 | 6.14.2 | Control Scheduler) | New N58 alert to DNO |
| 17 | 8.13 | Return Local Command Response | Update SR 6.14.2 response to DCC |
| 18 | 6.21 | Request Handover Of DCC Controlled Device | Network Operator Certificate on ESME |
| 18.1 | — | — | Network Operator Certificate on ESME |
| 19 | 6.15.1 | Update Security Credentials | Update load controller certs on ESME if APC is present. |